|
|
|
|
Tuunel21 is a modular system which is assembled from prefabricated elements. The system elements are mounted with minimal impact on the traffic flow. The quality corresponds to that of a cast-in-place concrete structure with the advantage of lower costs and a quicker execution.
|
|
|
|
|
The planning is carried out in our own technical office - hence, an assistance is guaranteed already in the planning phase by our certified employees !
The planning phase consists of the following points:
• Consultation
• Design planning
• Support with the plan statement
• Shell planning
• Static-constructive treatment
• Extent planning
The whole management of the project ist centrally directed and coordinated by us - as a general contractor we are your partner up to turnkey discharge.
The main construction time for an average tunnel passage (25meters long tube and 4 stairs) amounts to approx. 4 weeks. With underpasses lying in the ground water the construction we will need an additional 2 weeks.
If the possibility of a complete blockage of the traffic is given, underpasses with sealing can be built in a short insertion - only approx. 40 hours are necessary for a 15-m-long tube!
More than 300 underpasses were already realised with our system! A number which speaks for itself!
Characteristics
• Certified system - from the Eisenbahnbundesamt
• Standard widths of 2.50 m to 6.00 m in the grid of 0.50 m
• Variable length of the tube by modular design
• For all support kinds admitted
• Heights above ground to max. 1.80 m
• Flexibility by variable elements (wing shares, angle retaining walls, div. Tubes top piece shares)
• Adaptable to any local conditions
Advantages
• As a rule no settlements (bottom pressures smaller than the original bottom load)
• Very short construction times
• Minimum impediment of the fluent traffic
|
|
|
|
|
|